Maybe someone can give me feedback on the effects of the following:
This weekend I decided to coat my large (2 car + small workshop bench area) garage with epoxy.
Unfortunately, the epoxy must be laid down when the air AND surface temperature are at least 50 degrees F.
I should have done this earlier in the season, but
1) My house was constantly being worked on and the garage was always
full of either building materials, old carpet etc.
2) I wanted to do the floor last, so that cost me an extra week.
3) I didn't realize, or think in advance about, the temperature restrictions.
Anyway, because the temprature outside at application time was only about 50 and it had been colder overnight, I kept the garage doors CLOSED and turned the heat in the house up to 75, since the funrace / laundry room are in the garage area as a separate room, to which I kept the door open - I wanted the furnace to heat the garage up, which it did.
The garage was 60ish (at beginning) - 65 degrees (by the time I finished).
The concrete garage floor may have been cooler than 50; I don't know; oh well.
Anyway, on to my concern:
EXPOSURE TIMES AND HISTORY
This was my first time using (being exposed to) epoxy, so I don't have any prior exposure;
I read that it has a cumulative effect...
- The whole application took about 2 1/2 - 3 hours (2:20 - 5:15 or so for reference).
- I then went into the house, where the fumes (didn't realize it since I had been in them during application) were being drawn into the house through the force air of the heating system - fumes were bewing drawn into the furnace and then spread / blown throughout the house.
I left the house after about 2 hours and went away for about 4 - 4 1/2
hours.
I then stayed and slept in the house for another 13 hours before going out again.
I returned after about 2 - 3 hours and stayed for 3 - 4 more.
I did a few times, open some windows and run the attic (suction) fan for about 20 minutes (couldn't do it longer because the house was getting dramatically colder.
I also ran the fan briefly (15 minutes?) the day or night before at some point after applying the epoxy, if I remember correctly.
Also said screw it last night and opened one garage door for about 25 - 30 minutes.
I then went out since I had a headache and felt a little out of it (very minor nausea-type symptom, but not really actual nausea) and slept at my parents' place; I wish I had thought of, or done, that the FIRST night.
EFFECTS:
Anyone if this length of exposure (taking into account the the gaps when I was out, the fan running for those two sessions) could cause any longterm effects?
I still have a bit of a headache, but it is (very) minor to say the least.
NOTE THAT THIS WAS PRE-MIXED EPOXY, as opposed to the ones where you have to mix the two.
I may be overly concerned, but this was my first time working with epoxy.
Thanks in advance for any feedback!