As you guys know, my family moved back in July. While our new house is bigger than the last one, I lost my office and toy room. Everything that was in these two rooms got shuffled down to the basement.
With the weather getting cold, I figured it was time to start finishing the basement. This weekend we framed the walls for my office and what will be my toy room/second family room.
The electrician and HVAC guy comes this week. After that I have to run CAT5 and speaker wires. In November we'll be putting up the drywall. We probably won't mud and put up the trim until the spring though.
I still don't know what I'm going to do with the CAT5 from upstairs. It's all wired for phone right now and ends up by the circuit breaker. I'll probably put in a small patch panel and then run cables from there to the utility room where I'll be terminating all the new wiring.